Can CM-at-Risk be Lean?
By Andy Fulton The triangle below shows the separate but interdependent nature of a CM-at-Risk (CMAR) contract (commercial terms) with
Read moreBy Andy Fulton The triangle below shows the separate but interdependent nature of a CM-at-Risk (CMAR) contract (commercial terms) with
Read moreWe’ve covered “When Should PreCon Begin?” and “Who and What Should PreCon Include?” Now from our 75+ world-wide experts, from
Read more“We do not win on the project – we win in PreConstruction.” – Jason Schroeder On a sliding scale, the
Read moreLOOKING BACKThe term “Preconstruction” (“PreCon” for short) is vague and its meaning and content has been evolving over the decades.
Read moreTVD is gaining ground fast with owners, often emerging as a contractual requirement—and for good reason. Why wouldn’t a client
Read morePrecast highrise facades are regaining ground for several reasons: low cost per square foot, compliance with new energy codes (maximum
Read moreThis blog post discusses the use of Last Planner® in Design, and the language used here can be easily incorporated
Read morePERFORMING THE DESIGN WORK PLAN UPDATEPerform at the beginning of your regular Design Update Meeting, (30-45 MINUTES) Did (Status tags,
Read more“How do design professionals improve client outcomes and maximize design excellence? Designers indicated these two factors were most valuable to
Read moreWe’re often asked “What are the basic differences between Last Planner(R) in Construction vs in Design?” The process itself is